Infrastructure/Roadway Projects for 2021

 Roadway Improvements (to be completed or to completed this year)

– Reconstruction of the Intersection of Fern Ave & Strawbridge Ave

– Reconstruction of Estaugh Avenue from Norwood Avenue to the Dead End

– Norwood Avenue Pedestrian Bridge Replacement

– Roadway Improvements to Evergreen Avenue from Estaugh Avenue to the Dead End

– Reconstruction of Hazel Avenue from Westmont Avenue the Dead End

– Reconstruction of Hazel Terrace from Hazel Avenue to the Dead End

– Roadway Improvements to Cambridge Avenue from Emerald Avenue to Virginia Avenue

– Pedestrian Improvements at the Intersection of Stratford Avenue with Alton Avenue and Geneva Avenue

– Pedestrian Improvements at the Intersection of Emerald Avenue/Burrwood Avenue with Lawnside Avenue and E. Homestead Avenue

– Pedestrian Improvement at the Intersections of Nicholson Road with New Jersey Avenue and Pennsylvania Avenue

– Temporary Roadway Improvements to the Intersection of E. Albertson Avenue and Sunset Lane

– Temporary Roadway Improvements to the Intersection of Sunset Lane and Cooper Street

– Improvements to Stratford Avenue, Phase One from Cooper Street to Geneva Avenue

 

Storm Sewer Inlet/Manhole/ Pipe Outfall Repairs

– Inlet at the Intersection of Virginia Avenue and Center Street

– Manhole on Haddon Avenue near Crystal Lake Avenue

– Manhole on Geneva Avenue

– Washout at Edison Road

 

Water System Improvements

– E. Albertson Avenue Water Main Replacement and Storm Drainage Improvements

– Cuthbert Blvd. Water Main Replacement from the new Burger King to Heather Road

– Fire Hydrant Replacement at 404 Yale Avenue

– Fire Hydrant Replacement on Westmont Avenue near Hazel Avenue

– Fire Hydrant Replacement on W, Park Blvd. near Cuthbert Blvd.

– Fire Hydrant Replacement on Stratford Avenue near Oriental Avenue

– Fire Hydrant Replacement on Emerald Avenue near Pennsylvania Avenue

– Fire Hydrant Replacement on Burwood Avenue near Fern Avenue

 

Building Improvements

– Crystal Lake Swim Club A.D.A. Access and Deck Improvements

– Soil Remediation and Related Construction at the Municipal Building

– Champion School Fence Repairs and Exterior Improvements

 

Roadways Paved by P.S.E.G.

– Melrose Avenue from Center Street to Utica Avenue (full width)

– Utica Avenue from Melrose Avenue to Center Street (full width)

– Elgin Avenue from Cooper Street to the dead end (full width)

– Center Street from Emerald Avenue to Utica Avenue (full width)

– Oneida Avenue from Utica Avenue to Vesper Avenue (full width)

– Akron Avenue from Oneida Avenue to Alton Avenue (full width)

– Geneva Avenue from Oneida Avenue to Cooper Street (full width)

– Geneva Avenue from Cooper Street to Stratford Avenue (half width)

РVesper Avenue from Oneida Avenue to Cooper Street  (full width)

– Alton Avenue from Akron Avenue to Stratford Avenue (half width)

– Cooper Street from Emerald Avenue to S. Park Drive (half width)

– Hampton Road from Stratford Avenue to Edgewood Avenue (half width)

– Edgewood Avenue from Hampton Road to S. Park Drive (half width)

– West Drive from Hampton Road to S. Park Drive (half width)

-Glendale Avenue from Edgewood Avenue to S. Park Drive (full width)

– Strawbridge Avenue at the end at the intersection of Glendale Avenue and S. Park Drive (half width)

– Bradford Avenue from S. Park Drive to Fern Avenue (half width)

– S. Park Drive from Cuthbert Avenue to Saginaw Avenue (half width)